Thursday, August 11, 2022

Day 11 - After a 4" rain last night and another brief rainfall this morning, the sunroom had standing water on the floor boards and the roof was too wet to work on. At 9am a two-man crew arrived with a load of pressure-treated boards and posts and vinyl sleeve material for the deck bench frames. By the end of the work day, the bench frames were nearly completed, with a few blocking/support boards remaining to be installed. The bench frames will be covered with Trex boards when the deck flooring is installed.

More rain at 7:30am


Attaching bench support arm to 4x4 post


Posts covered with vinyl sleeves positioned with guide strings




Sunroom floor nearly dry at 1:30pm


Attaching front and back bench rails


Positioning blocking boards


Pneumatic nail gun



Marking position of blocking board


End of day deck overview


Bench line-up


Post-eye view


Space between bench and sunroom for stairs


Bench frame test