Day 8 - The crew worked all day on installing the flooring for the sunroom. Bottom panels were installed for insulation that will be installed later, followed by the installation of the sub-flooring boards. Once the sunroom is closed in and protected from the outside weather, the floor boards will be lifted up to allow the placement of the floor insulation.
At the end of the work day, the sunroom components were delivered for the wall and roof structures.